Rehabilitation of the West North Broadway Bridge over the Olentangy River by applying a variable thickness overlay and installing a concrete barrier to provide a shared-use path on the south side of the bridge and sidewalk on the north side of the bridge. Other work
includes converting the abutments to semi-integral, replacing bearings and approach slabs, and upgrading the existing wingwalls.
PROJECT UPDATE: Frank Road at Brown Road, Hardy Parkway Street, and Brown Road (Township)
This project consists of converting the existing signalized intersection of Frank Road at Hardy Parkway Street and Brown Road to a 2x1 roundabout. The project will also convert the existing stop-controlled intersection of Frank Road at Brown Road (Township) to a 2x1...