Rehabilitation of the West North Broadway Bridge over the Olentangy River by applying a variable thickness overlay and installing a concrete barrier to provide a shared-use path on the south side of the bridge and sidewalk on the north side of the bridge. Other work
includes converting the abutments to semi-integral, replacing bearings and approach slabs, and upgrading the existing wingwalls.
PROJECT UPDATE: Trabue Road Bridge 10.77 over Scioto River & Bridge 10.89 over Scioto Pointe Drive
This project includes upgrading 0.285 miles of Trabue Road by rehabilitating and widening bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the bridge decks with composite reinforced...