We are accepting bids on the Kropp Road Drainage Outlet Improvement Part 2. The bid submittal deadline is September 1, 2026, at 10:00 a.m. Visit: https://www.bidexpress.com/solicitations for more information.

We are accepting bids on the Kropp Road Drainage Outlet Improvement Part 2. The bid submittal deadline is September 1, 2026, at 10:00 a.m. Visit: https://www.bidexpress.com/solicitations for more information.
This project rehabilitated the Harrisburg-Georgesville Road Bridge over Big Darby Creek between Opossum Run Road and London-Groveport Road. The rehabilitated structure includes recreating the original 1932 decorative bridge railing detail , repair of the concrete...
This project will replace the existing traffic signals and stop signs at the Frank Road intersections with Hardy Parkway Street and Brown Road with two-lane roundabouts. The improvements will include drainage upgrades, new street lighting, and pedestrian improvements...
Notice to Contractors: We are accepting bids on the Hott Ditch Improvements Project Visit: https://www.bidexpress.com/solicitations for more information
This project consists of widening 1.03 miles of Rohr Road to provide left turn lanes at Bixby Road and Creekside Parkway and includes the addition of a two-way left turn lane from Creekside Parkway to a point 375' from the intersection of Shook Road and Rohr Road....
This project consisted of improving the existing and deficient offset intersection geometry by upgrading 0.26 miles of New Albany-Condit Road and 0.19 miles of Walnut Street by constructing a modern 2x1 multilane roundabout at the intersection of New Albany-Condit...
This project consists of converting the existing signalized intersection of Frank Road at Hardy Parkway Street and Brown Road to a 2x1 roundabout. The project will also convert the existing stop-controlled intersection of Frank Road at Brown Road (Township) to a 2x1...
Rehabilitation of the West North Broadway Bridge over the Olentangy River by applying a variable thickness overlay and installing a concrete barrier to provide a shared-use path on the south side of the bridge and sidewalk on the north side of the bridge. Other work...
This project includes upgrading 0.285 miles of Trabue Road by rehabilitating and widening bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the bridge decks with composite reinforced...
The project includes the full depth reconstruction of 1.02 miles of East Cooke Road, from Karl Road to Cleveland Ave. This project will also construct curb and gutter, a 10' wide asphalt shared-use path, a 5' wide concrete sidewalk, storm sewer improvements, and...