Rehabilitation of the West North Broadway Bridge over the Olentangy River by applying a variable thickness overlay and installing a concrete barrier to provide a shared-use path on the south side of the bridge and sidewalk on the north side of the bridge. Other work
includes converting the abutments to semi-integral, replacing bearings and approach slabs, and upgrading the existing wingwalls.
PROJECT UPDATE: Zuber Road – Plum Road Drainage Improvement Project
This project will improve approximately 8,206 feet of drainage along Zuber Road and Young Road by clearing and improving the drainage ditch, restoring its proper grade, and replacing and lowering culverts to improve stormwater flow.
