Woodrow Ditch

A maroon progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION, and COMPLETE. Only the COMPLETE stage has a checkmark, indicating completion.
The current portion of the work on Woodrow Ditch is to clear 750' of ditch between Reaver Lane and SR 62. After clearing we will also attempt to locate a historic drainage tile that runs under a portion of this section of Woodrow.

PROJECT TYPE:

Drainage

COST:

$75,000.00

BEGIN CONSTRUCTION DATE:

11/3/2025

FINAL COMPLETION DATE:

5/1/2026

MAINTENANCE OF TRAFFIC: 

Traffic maintained.

FUNDING: 

Drainage Engineer Funded

DESIGN CONSULTANT: 

In-House Design

CONSTRUCTION CONTRACTOR: 

Franklin County Drainage Utility Crew

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2025

LOCATION:

In Franklin Township, from the north side of Reaver Lane to the west side of Harrisburg Pike (SR 62). Starting at 1476 Reaver and ending at 906 Harrisburg Pike.