West North Broadway Bridge 1.18 over Olentangy River

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
Rehabilitate the West North Broadway Bridge over Olentangy River. The project will include reconfiguring the existing bridge deck to provide a sidewalk on the north side of the bridge and a shared-use path on the south side of the bridge connecting to the Olentangy Trail, a new concrete barrier wall and pedestrian railing, along with a new bridge deck overlay and approaches, semi-integral abutment conversion, new bearings, and upgrades to the existing wingwalls.

PROJECT TYPE:

Bridge

COST:

$2,862,930.42

BEGIN CONSTRUCTION DATE:

6/2/2025

FINAL COMPLETION DATE:

7/30/2026

MAINTENANCE OF TRAFFIC: 

Traffic maintained during construction, reduced to one lane in each direction.

FUNDING: 

Ohio Department of Transportation (ODOT) LBR funds, Ohio Public Works Commission (OPWC), Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Parsons

CONSTRUCTION CONTRACTOR: 

Complete General Construction

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2025

LOCATION:

West North Broadway Bridge over Olentangy River, between Milton Avenue and Ohio Health Parkway

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org