West North Broadway Bridge 1.18 over Olentangy River

Rehabilitate the West North Broadway Bridge over Olentangy River. The project will include reconfiguring the existing bridge deck to provide a sidewalk on the north side of the bridge and a shared-use path on the south side of the bridge connecting to the Olentangy Trail, a new concrete barrier wall and pedestrian railing, along with a new bridge deck overlay and approaches, semi-integral abutment conversion, new bearings, and upgrades to the existing wingwalls.
PROJECT TYPE:
Bridge
COST:
$2,862,930.42
BEGIN CONSTRUCTION DATE:
6/2/2025
FINAL COMPLETION DATE:
7/30/2026
MAINTENANCE OF TRAFFIC:
Traffic maintained during construction, reduced to one lane in each direction.
FUNDING:
Ohio Department of Transportation (ODOT) LBR funds, Ohio Public Works Commission (OPWC), Motor Vehicle Registration and Gas User Fees
DESIGN CONSULTANT:
Parsons
CONSTRUCTION CONTRACTOR:
Complete General Construction
CONSTRUCTION INSPECTOR:
Franklin County Engineer's Office
CONSTRUCTION YEAR:
2025
LOCATION:
West North Broadway Bridge over Olentangy River, between Milton Avenue and Ohio Health Parkway
CONTACT INFORMATION:
Phone: 614-525-3030