Trabue Road Bridge 10.77 over Scioto River & Bridge 10.89 over Scioto Pointe Drive

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
Upgrading 0.285 miles of Trabue Road by rehabilitating and widening of bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the decks with composite reinforced concrete decks, new approach slabs, semi-integral abutment conversion, parapets, sidewalks, shared-use path, and resurfacing of Trabue Road.

PROJECT TYPE:

Bridge

COST:

BEGIN CONSTRUCTION DATE:

8/19/2024

FINAL COMPLETION DATE:

MAINTENANCE OF TRAFFIC: 

Phases 1-2: Two-way traffic maintained on the south and north side of Trabue Road, respectively

Phase 3: Westbound curb lane closed on Trabue Road

Phase 4: Traffic maintained under flagger control

Additionally, Scioto Point Drive may be fully closed to traffic under the bridge

FUNDING: 

DESIGN CONSULTANT: 

Osborn

CONSTRUCTION CONTRACTOR: 

Complete General / ASI (CM)

CONSTRUCTION INSPECTOR: 

American Structurepoint, Inc. - Larry Lyons

CONSTRUCTION YEAR: 

2024

LOCATION:

Trabue Road over the Scioto River and Scioto Pointe Drive, between Riverside Drive (US-33) and Lake Shore Drive / Quarry Trails Drive

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org