Renner Road (Alton & Darby Creek Road to Spindler Road)

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
This project involves 0.75 miles of improvements of Renner Road from Alton & Darby Creek Road to Spindler Road. Improvements include pavement widening to a 3-lane section, a 10' wide shared-use path and 5' wide sidewalk, lane reconfiguration, total bridge replacement and widening over Clover Groff Ditch, and drainage improvements.

PROJECT TYPE:

Highway

COST:

$4,820,239.45

BEGIN CONSTRUCTION DATE:

3/31/2025

FINAL COMPLETION DATE:

10/30/2026

MAINTENANCE OF TRAFFIC: 

Pre-Phase: Two-way one lane traffic maintained via flagger control
Phase 1: Westbound traffic maintained only
Phase 2: Full closure of Renner Road
Phase 3: Two-way traffic maintained
Phase 4: Two-way one lane traffic maintained via flagger control

FUNDING: 

Ohio Public Works Commission (OPWC), Private Developer, Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

EMH&T

CONSTRUCTION CONTRACTOR: 

J&J Schlaegel

CONSTRUCTION INSPECTOR: 

Kurt Selkinghaus

CONSTRUCTION YEAR: 

2025

LOCATION:

Renner Road between Alton & Darby Creek Road and Spindler Road

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org

DETOUR MAP