Marlane Drive Bridge 0.67 over Marsh Run

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Install a prefabricated superstructure on top of Redi-Rock abutments, behind existing abutment walls. This is a simplified design project that will use Franklin County Bridge Maintenance crews to demo and then install the Redi-Rock substructure. The prefabricated superstructure will need to be designed to accommodate minimal formwork if a deck pour is required.

PROJECT TYPE:

Bridge

COST:

TBD

BEGIN CONSTRUCTION DATE:

5/31/2027

FINAL COMPLETION DATE:

8/1/2027

MAINTENANCE OF TRAFFIC: 

Full Closure

FUNDING: 

Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Woolpert

CONSTRUCTION CONTRACTOR: 

Franklin County Engineer - Bridge Maintenance

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2027

LOCATION:

Marlane Drive Bridge 0.67 over Marsh Run, just east of Gantz Road

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org