Marlane Drive Bridge 0.67 over Marsh Run

Install a prefabricated superstructure on top of Redi-Rock abutments, behind existing abutment walls. This is a simplified design project that will use Franklin County Bridge Maintenance crews to demo and then install the Redi-Rock substructure. The prefabricated superstructure will need to be designed to accommodate minimal formwork if a deck pour is required.
PROJECT TYPE:
Bridge
COST:
TBD
BEGIN CONSTRUCTION DATE:
5/31/2027
FINAL COMPLETION DATE:
8/1/2027
MAINTENANCE OF TRAFFIC:
Full Closure
FUNDING:
Motor Vehicle Registration and Gas User Fees
DESIGN CONSULTANT:
Woolpert
CONSTRUCTION CONTRACTOR:
Franklin County Engineer - Bridge Maintenance
CONSTRUCTION INSPECTOR:
Franklin County Engineer's Office
CONSTRUCTION YEAR:
2027
LOCATION:
Marlane Drive Bridge 0.67 over Marsh Run, just east of Gantz Road