Lockbourne Road (Magnolia Trail to Collings Drive) Pedestrian Improvements

Construct a 10-foot shared-use path from the intersection of the Magnolia Trail and Lockbourne Road north along the east side of Lockbourne Road to SR-317 and then east to Collings Drive. A portion of this path will be constructed by an adjacent development.
PROJECT TYPE:
Mobility
COST:
$975,460.00
BEGIN CONSTRUCTION DATE:
1/7/2030
FINAL COMPLETION DATE:
5/30/2031
MAINTENANCE OF TRAFFIC:
Two-way one lane traffic permitted outside of peak hours.
FUNDING:
COTA Transit-Supportive Infrastructure Funds, Village of Lockbourne
DESIGN CONSULTANT:
OHM
CONSTRUCTION CONTRACTOR:
TBD
CONSTRUCTION INSPECTOR:
Franklin County Engineer's Office
CONSTRUCTION YEAR:
2030
LOCATION:
Lockbourne Road from the Magnolia Trail to SR-317 and SR-317 from Lockbourne Road to Collings Drive.