Leppert Road Bridge 1.48 SUP over Hayden Run

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
This is a pedestrian sidewalk connectivity project that will connect a future Hilliard shared-use path to the City of Columbus sidewalk.

PROJECT TYPE:

Bridge

COST:

$242,320.00

BEGIN CONSTRUCTION DATE:

7/6/2026

FINAL COMPLETION DATE:

8/14/2026

MAINTENANCE OF TRAFFIC: 

Southbound Lane Closure

FUNDING: 

Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

CMT

CONSTRUCTION CONTRACTOR: 

Franklin County Engineer - Bridge Maintenance/ Axis Civil

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2026

LOCATION:

Leppert Road Bridge 1.48 Pedestrian Improvement over Hayden Run, between Arcadian Avenue and Hayden Run Road