Lancaster Avenue Bridge 0.04 over French Run

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Complete bridge replacement of the existing Lancaster Avenue 0.04 structure over French Run with a new single span composite prestressed concrete box beam structure with concrete sidewalk. Project includes roadway approach work, drive approaches, and grading.

PROJECT TYPE:

Bridge

COST:

$1,535,229.00

BEGIN CONSTRUCTION DATE:

6/1/2030

FINAL COMPLETION DATE:

TBD

MAINTENANCE OF TRAFFIC: 

Full Closure

FUNDING: 

Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Korda

CONSTRUCTION CONTRACTOR: 

TBD

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2030

LOCATION:

Lancaster Avenue Bridge 0.04 over French Run, just north of East Main Street

CONTACT INFORMATION: 