Frank Road Bridge 7.31 over Early Run

Complete bridge replacement of the existing Frank Rd 7.31 structure over Early Run with a CONSPAN O-Series precast concrete arch culvert with the addition of a shared-use path, on the south side, and reconstruction of existing sidewalk, on the north side.
PROJECT TYPE:
Bridge
COST:
$3,101,030.00
BEGIN CONSTRUCTION DATE:
4/3/2028
FINAL COMPLETION DATE:
TBD
MAINTENANCE OF TRAFFIC:
Traffic maintained during construction, reduced to one lane in each direction.
FUNDING:
Ohio Department of Transportation (ODOT) LBR funds, Motor Vehicle Registration and Gas User Fees
DESIGN CONSULTANT:
Mead & Hunt
CONSTRUCTION CONTRACTOR:
TBD
CONSTRUCTION INSPECTOR:
Franklin County Engineer's Office
CONSTRUCTION YEAR:
2028
LOCATION:
Frank Road Bridge 7.31 over Early Run, between Gantz Road and Westbrook Drive
CONTACT INFORMATION:
Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org