Frank Road Bridge 7.31 over Early Run

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Complete bridge replacement of the existing Frank Rd 7.31 structure over Early Run with a CONSPAN O-Series precast concrete arch culvert with the addition of a shared-use path, on the south side, and reconstruction of existing sidewalk, on the north side.

PROJECT TYPE:

Bridge

COST:

$3,101,030.00

BEGIN CONSTRUCTION DATE:

4/3/2028

FINAL COMPLETION DATE:

TBD

MAINTENANCE OF TRAFFIC: 

Traffic maintained during construction, reduced to one lane in each direction.

FUNDING: 

Ohio Department of Transportation (ODOT) LBR funds, Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Mead & Hunt

CONSTRUCTION CONTRACTOR: 

TBD

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2028

LOCATION:

Frank Road Bridge 7.31 over Early Run, between Gantz Road and Westbrook Drive

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org