Frank Road at Brown Road, Hardy Parkway Street, and Brown Road (Township)

Construction of two multi-lane roundabouts at the existing intersections of Frank Road at Brown Road (County) and Hardy Parkway Street and at Brown Road (Township).
PROJECT TYPE:
Highway
COST:
$8,924,851.03
BEGIN CONSTRUCTION DATE:
2/9/2026
FINAL COMPLETION DATE:
5/28/2027
MAINTENANCE OF TRAFFIC:
- Maintaining 1 lane in each direction on Frank Rd throughout construction, with independent closures of each side street being required.
Phase 1 (90-days): North Leg
Phase 2 (30-days): Center
Phase 3A (45-days): South Leg
Phase 3B (10-days): South Leg at Certified Oil Driveway
Phase 3C (30-days): Hardy Parkway Street
Phase 4 (35-days): Frank Road splitter islands, intermediate course, center islands
Phase 5 (10-days): Final surface course, striping, signage
FUNDING:
["Ohio Department of Transportation (ODOT) Safety Funds","Ohio Public Works Commission (OPWC)","Motor Vehicle Registration and Gas User Fees"]
DESIGN CONSULTANT:
EL Robinson
CONSTRUCTION CONTRACTOR:
Strawser Paving
CONSTRUCTION INSPECTOR:
Kurt Selkinghaus
CONSTRUCTION YEAR:
2026
LOCATION:
Frank Road at Brown Road, Hardy Parkway Street, and Brown Road (Township)
CONTACT INFORMATION:
Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org
DETOUR MAP