Flint Road Bridge 0.64 over Tributary of Olentangy River

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Complete replacement of the existing structure with repurposed 60" reinforced concrete pipe (RCP) and Redi-Rock wingwalls.

PROJECT TYPE:

Bridge

COST:

TBD

BEGIN CONSTRUCTION DATE:

6/1/2027

FINAL COMPLETION DATE:

TBD

MAINTENANCE OF TRAFFIC: 

Full Closure

FUNDING: 

Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Franklin County Engineer's Office

CONSTRUCTION CONTRACTOR: 

Franklin County Engineer - Bridge Maintenance

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2027

LOCATION:

Flint Road Bridge 0.64 over Tributary of Olentangy River, between Park Road and Melyers Court

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org