Fishinger Road Bridge 0.46 over Scioto River

Rehabilitation of Fishinger Road bridge over the Scioto River including concrete deck overlay, painting structural steel, and reducing lane widths to provide a shared-use path (SUP) on the structure. Other items include converting sidewalks on each side to a SUP, mill and overlay approaches and guardrail upgrades.
PROJECT TYPE:
Bridge
COST:
$8,685,800.00
BEGIN CONSTRUCTION DATE:
6/4/2029
FINAL COMPLETION DATE:
TBD
MAINTENANCE OF TRAFFIC:
Full Closure
FUNDING:
Motor Vehicle Registration and Gas User Fees
DESIGN CONSULTANT:
Jacobs
CONSTRUCTION CONTRACTOR:
TBD
CONSTRUCTION INSPECTOR:
Franklin County Engineer's Office
CONSTRUCTION YEAR:
2029
LOCATION:
Fishinger Road Bridge 0.46 over Scioto River, between Dublin Road and Riverside Drive (US-33)
CONTACT INFORMATION:
Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org