Cooper Road Bridge 1.82 over Noble Run

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
Superstructure Replacement using NEXT beams. A sidewalk will be constructed on the east side of the bridge that will connect two sections of existing sidewalk for Westerville.

PROJECT TYPE:

Bridge

COST:

$861,597.00

BEGIN CONSTRUCTION DATE:

7/27/2026

FINAL COMPLETION DATE:

10/23/2026

MAINTENANCE OF TRAFFIC: 

Full Closure

FUNDING: 

City of Westerville, Motor Vehicle Registration and Gas User Fees, Ohio Public Works Commission (OPWC)

DESIGN CONSULTANT: 

TRC

CONSTRUCTION CONTRACTOR: 

Franklin County Engineer & General Bridge Maintenance Contactor

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2026

LOCATION:

Cooper Road Bridge 1.82 over Noble Run, between Meacham Run Court and Schrock Road

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org