Amity Road Bridge 6.33 over Patterson Ditch

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Full replacement of the existing corrugated metal pipe (CMP) culvert by Bridge Maintenance Crews. The new structure will be a 10'x10' reinforced concrete box and inventoried as a bridge.

PROJECT TYPE:

Bridge

COST:

BEGIN CONSTRUCTION DATE:

10/5/2026

FINAL COMPLETION DATE:

MAINTENANCE OF TRAFFIC: 

Full closure/detour

FUNDING: 

DESIGN CONSULTANT: 

BG Engineering

CONSTRUCTION CONTRACTOR: 

Bridge Maintenance

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2026

LOCATION:

Amity Road Bridge 6.33 over Patterson Ditch, between Morris Road and Patterson Road

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org