McCoy Ditch Lateral 4 (West Broad Street to Norfolk Southern Railroad)

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Replace approximately 4200 linear feet of tile originally constructed as Lateral 4 of the McCoy Petition.

PROJECT TYPE:

Drainage

COST:

TBD

BEGIN CONSTRUCTION DATE:

10/15/2026

FINAL COMPLETION DATE:

11/30/2026

MAINTENANCE OF TRAFFIC: 

Traffic maintained.

FUNDING: 

Drainage Engineer Funded, Private Developer

DESIGN CONSULTANT: 

Franklin County Drainage Engineer

CONSTRUCTION CONTRACTOR: 

Franklin County Drainage Utility Crew

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2026

LOCATION:

On the north side of West Broad Street approximately 4700' west of the intersection of Amity Road and West Broad Street.