2026 Township Resurfacing Program

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
Upgrading various sections of Franklin County township roadways, detailed within; with asphalt resurfacing, curb, and sidewalk replacement.

PROJECT TYPE:

Resurfacing

COST:

$4,415,784.35

BEGIN CONSTRUCTION DATE:

5/4/2026

FINAL COMPLETION DATE:

10/9/2026

MAINTENANCE OF TRAFFIC: 

Multiple short duration lane closures throughout various township roadways.

FUNDING: 

Various Townships

DESIGN CONSULTANT: 

FCEO Internal

CONSTRUCTION CONTRACTOR: 

The Shelly Company

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2026

LOCATION:

Various Township Roads within Franklin County.

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org