Kropp Road Drainage Outlet – Part 2

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Replace approximately 3,710 linear feet of existing storm sewer with new storm sewer lines and structures along Krebs Ditch. Project begins at Hellbranch Run just east of Norton Road and extends to an existing catch basin just south of Kropp Road.

PROJECT TYPE:

Drainage

COST:

$2,083,285.00

BEGIN CONSTRUCTION DATE:

11/2/2026

FINAL COMPLETION DATE:

5/14/2027

MAINTENANCE OF TRAFFIC: 

Norton Road to be closed to install road culvert; Date TBD.

FUNDING: 

Ohio Public Works Commission (OPWC), Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Stone Environmental

CONSTRUCTION CONTRACTOR: 

TBD

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2026

LOCATION:

Kropp Road