Tippet Road Bridge 0.15 over Cook Tri-County Ditch

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Complete replacement of the existing reinforced concrete pipe with a reinforced 4-sided concrete box by Franklin County Bridge Maintenance crews.

PROJECT TYPE:

Bridge

COST:

$239,582.00

BEGIN CONSTRUCTION DATE:

6/1/2027

FINAL COMPLETION DATE:

TBD

MAINTENANCE OF TRAFFIC: 

Full Closure

FUNDING: 

Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Franklin County Engineer's Office

CONSTRUCTION CONTRACTOR: 

Franklin County Engineer - Bridge Maintenance

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2027

LOCATION:

Tippet Road Bridge 0.15 over Cook Tri-County Ditch, between US-62 and Fancher Road

CONTACT INFORMATION: 

Phone: 614-525-3030