Tippet Road Bridge 0.15 over Cook Tri-County Ditch

Complete replacement of the existing reinforced concrete pipe with a reinforced 4-sided concrete box by Franklin County Bridge Maintenance crews.
PROJECT TYPE:
Bridge
COST:
$239,582.00
BEGIN CONSTRUCTION DATE:
6/1/2027
FINAL COMPLETION DATE:
TBD
MAINTENANCE OF TRAFFIC:
Full Closure
FUNDING:
Motor Vehicle Registration and Gas User Fees
DESIGN CONSULTANT:
Franklin County Engineer's Office
CONSTRUCTION CONTRACTOR:
Franklin County Engineer - Bridge Maintenance
CONSTRUCTION INSPECTOR:
Franklin County Engineer's Office
CONSTRUCTION YEAR:
2027
LOCATION:
Tippet Road Bridge 0.15 over Cook Tri-County Ditch, between US-62 and Fancher Road
CONTACT INFORMATION:
Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org