Chippewa Street Bridge 0.02 over Barbee Ditch

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Replace the existing Chippewa Street 0.02 superstructure utilizing a design that can be built with accelerated construction techniques, provide substructure rehabilitation alternatives, and evaluate the addition of pedestrian facilities, along with other incidentals.

PROJECT TYPE:

Bridge

COST:

TBD

BEGIN CONSTRUCTION DATE:

6/1/2028

FINAL COMPLETION DATE:

TBD

MAINTENANCE OF TRAFFIC: 

Traffic maintained during construction, but reduced to one lane.

FUNDING: 

Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

AMT

CONSTRUCTION CONTRACTOR: 

TBD

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2028

LOCATION:

Chippewa Street Bridge 0.02 over Barbee Ditch, just west of Amity Road

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org