Cooper Road Bridge 0.83 over Tributary of Alum Creek

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
Replace the existing 12-foot structure just south of Blendon Woods Boulevard. The new structure should consider widening to the west of Cooper Road to eliminate guardrail at the southwest corner of Blendon Woods Boulevard. The widening will allow for a future City of Columbus shared-use path.

PROJECT TYPE:

Bridge

COST:

TBD

BEGIN CONSTRUCTION DATE:

6/1/2029

FINAL COMPLETION DATE:

TBD

MAINTENANCE OF TRAFFIC: 

Full Closure

FUNDING: 

Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Mannik & Smith Group

CONSTRUCTION CONTRACTOR: 

TBD

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2029

LOCATION:

Cooper Road Bridge 0.83 over Tributary of Alum Creek, just south of the intersection with Blendon Woods Boulevard

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org