2025 Township Resurfacing Program

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
Upgrading various sections of Franklin County township roadways including asphalt resurfacing, curb, and sidewalk replacement.

PROJECT TYPE:

Resurfacing

COST:

$3,697,662.51

BEGIN CONSTRUCTION DATE:

6/23/2025

FINAL COMPLETION DATE:

7/31/2026

MAINTENANCE OF TRAFFIC: 

Flagger controlled MOT. 

FUNDING: 

Various Townships

DESIGN CONSULTANT: 

FCEO Internal

CONSTRUCTION CONTRACTOR: 

Shelly Company

CONSTRUCTION INSPECTOR: 

Mark Mullenax / Jesse Wahl

CONSTRUCTION YEAR: 

2025

LOCATION:

Various Township Roads within Franklin County

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org