Brown Road (Marsdale Avenue to Stimmel Road)

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
This project involves 1.05 miles of improvements from Marsdale Avenue to Stimmel Road/Linnet Avenue. Improvements include a 10' wide shared-use path and 5' wide sidewalk along the length of the corridor, lane restriping, curb and gutter, culvert widening, drainage improvements, and intersection lighting. This project features a single-lane, standard roundabout at the intersection of Brown Road and Hopkins Avenue.

PROJECT TYPE:

Highway

COST:

$8,993,375.38

BEGIN CONSTRUCTION DATE:

2/5/2029

FINAL COMPLETION DATE:

5/31/2030

MAINTENANCE OF TRAFFIC: 

TO BE DETERMINED

FUNDING: 

Ohio Department of Transportation (ODOT) Safety Funds, COTA Transit-Supportive Infrastructure Funds, Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Carpenter Marty

CONSTRUCTION CONTRACTOR: 

TBD

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2029

LOCATION:

Brown Road, between Marsdale Avenue and Stimmel Road / Linnet Avenue

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org