Zuber Road – Plum Run Drainage Section 1

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
Section 1 - This project consists of 2,576 linear feet of drainage ditch improvements and profile grade restoration to address impairment by sediment deposition and allow major flood routing to function properly.

PROJECT TYPE:

Drainage

COST:

BEGIN CONSTRUCTION DATE:

9/15/2025

FINAL COMPLETION DATE:

MAINTENANCE OF TRAFFIC: 

N/A

FUNDING: 

DESIGN CONSULTANT: 

CESO

CONSTRUCTION CONTRACTOR: 

V3 Construction Group Limited

CONSTRUCTION INSPECTOR: 

Brady Koehler/Don Murphy

CONSTRUCTION YEAR: 

2025

LOCATION:

Jackson Township beginning at Plum Run approximately 2600' south of Zuber Road and 2350' west of Hoover Road and proceeding generally west under Ridpath Road and Seeds Road to end on the west side of Seeds Road.