West North Broadway Bridge 1.18 over Olentangy River

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
Rehabilitation of the West North Broadway 1.18 Bridge over the Olentangy River by applying a variable thickness overlay and installing a concrete barrier to provide a shared-use path on the south side of the bridge and sidewalk on the north side of the bridge. Other work includes converting the abutments to semi-integral, replacing bearings and approach slabs, and upgrading the existing wingwalls.

PROJECT TYPE:

Bridge

COST:

$2,862,930.42

BEGIN CONSTRUCTION DATE:

6/2/2025

FINAL COMPLETION DATE:

7/17/2026

MAINTENANCE OF TRAFFIC: 

Traffic maintained during construction, reduced to one lane in each direction.

FUNDING: 

Ohio Department of Transportation (ODOT) LBR funds, Ohio Public Works Commission (OPWC), Motor Vehicle Registration and Gas User Fees

DESIGN CONSULTANT: 

Parsons

CONSTRUCTION CONTRACTOR: 

Complete General Construction

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2025

LOCATION:

West North Broadway Bridge 1.18 over Olentangy River, between Milton Avenue and Ohio Health Parkway

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org