Rohr Road (Bixby Road to Shook Road)

A progress bar with three stages: IN DESIGN, UNDER CONSTRUCTION (highlighted with a check mark), and COMPLETE (greyed out). The process is currently at the UNDER CONSTRUCTION stage.
This project involves 1.03 miles of improvements of Rohr Road from Bixby Road to Shook Road. Improvements include pavement widening to a 3-lane section, a 10' wide shared-use path and 5' wide sidewalk, lane reconfiguration, and drainage improvements.

PROJECT TYPE:

Highway

COST:

$3,548,334.79

BEGIN CONSTRUCTION DATE:

5/4/2026

FINAL COMPLETION DATE:

4/30/2027

MAINTENANCE OF TRAFFIC: 

Phase 2B (60-days): 6/1/26 to 8/14/26
Phase 2A (21-days): 6/1/26 to 8/14/26
Phase 2C (weekend): 6/1/26 to 8/14/26
Phase 3 (21-days)
Phase 4 (60-days)
Phase 5 (60-days)

FUNDING: 

Franklin County Transportation Improvement District, City of Obetz, Motor Vehicle Registration and Gas User Fees, Ohio Department of Transportation (ODOT) Transportation Improvement District (TID)

DESIGN CONSULTANT: 

Kimley-Horn

CONSTRUCTION CONTRACTOR: 

Strawser Paving

CONSTRUCTION INSPECTOR: 

Shaun Armstrong

CONSTRUCTION YEAR: 

2026

LOCATION:

Rohr Road From Bixby Road to Shook Road within the City of Obetz

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org

DETOUR MAP