Eiterman Road Bridge 0.75 over South Fork Indian Run

Replace the existing Eiterman Road Bridge over South Fork Indian Run with a concrete box culvert. The project will include widening to accommodate a future build-out of the Dublin thoroughfare plan, which includes pedestrian and bicycle facilities.
PROJECT TYPE:
Bridge
COST:
$893,496.60
BEGIN CONSTRUCTION DATE:
6/23/2025
FINAL COMPLETION DATE:
4/28/2026
MAINTENANCE OF TRAFFIC:
Full Closure
FUNDING:
Ohio Public Works Commission (OPWC), City of Dublin, Motor Vehicle Registration and Gas User Fees
DESIGN CONSULTANT:
Fishbeck
CONSTRUCTION CONTRACTOR:
Shelly & Sands
CONSTRUCTION INSPECTOR:
Franklin County Engineer's Office
CONSTRUCTION YEAR:
2025
LOCATION:
Eiterman Road Bridge over South Fork Indian Run, near the Union County border, between Bobcat Way and University Boulevard
CONTACT INFORMATION:
Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org
DETOUR MAP