Alum Creek Drive (London-Groveport Road (SR-317) to Groveport Road)

A progress tracker with three stages: IN DESIGN (highlighted in red with a check mark), UNDER CONSTRUCTION (greyed out), and COMPLETE (greyed out).
This project includes the widening of existing Alum Creek Drive (C.R. 122) from London-Groveport Road (SR-317) to Groveport Road, complete bridge replacement over Big Walnut Creek, roadway lighting, proposed drainage improvements as well as additional enhancements to improve pedestrian safety with a shared-use path and sidewalk the entire length of the corridor.

PROJECT TYPE:

Highway

COST:

$51,439,288.27

BEGIN CONSTRUCTION DATE:

2/1/2028

FINAL COMPLETION DATE:

5/31/2030

MAINTENANCE OF TRAFFIC: 

Expect multiple full closure phases during major intersection work. Two lanes of north bound and south bound traffic will be maintained for the majority of construction.

FUNDING: 

Federal Highway Administration BUILD grant, , Ohio Department of Transportation's Transportation Review Advisory Council (TRAC), Mid-Ohio Regional Planning Commission (MORPC) Funds, COTA Transit-Supportive Infrastructure Funds, Franklin County Transportation Improvement District, Central Ohio Transit Agency (COTA), City of Obetz, Madison Township, Private Developers, Motor Vehicle Registration and Gas User Fees, Community Project Funding

DESIGN CONSULTANT: 

Stantec, Inc.

CONSTRUCTION CONTRACTOR: 

TBD

CONSTRUCTION INSPECTOR: 

Franklin County Engineer's Office

CONSTRUCTION YEAR: 

2028

LOCATION:

Alum Creek Drive (C.R. 122) from London-Groveport Road (SR-317) to Groveport Road.

CONTACT INFORMATION: 

Phone: 614-525-3030
Email: fracoeng@franklincountyengineer.org